PETRONAS RAPID project facts

Industry:
Euro-Fuels – Ethane Cracker
Client:
PETRONAS RAPID Project
Location:
Malaysia
Tower type:
28-Cell Low-Noise Counterflow Cooling Tower
Structure:
Concrete
Year:
2015

Project description

The project was executed on a turnkey basis, covering engineering, supply and construction within the defined schedule and budget. The design focused on low-noise operation while keeping high thermal efficiency and long-term reliability for continuous petrochemical production.

It was completed on time and within budget.

Project highlights

  • 28-cell low-noise counterflow cooling tower for an ethane cracker

  • Delivered for the PETRONAS RAPID Euro-Fuels petrochemical complex

  • Completed on time and within budget on a turnkey basis

  • Designed for reliability, efficiency and continuous operation

  • Stable cooling performance for critical petrochemical production

Cooling tower support after construction

ICST supports its projects after construction with cooling tower services: a maintenance plan with regular maintenance, tower repair, replacement parts such as tower fill and drift eliminators, and thermal upgrades. Technical assistance is available throughout. See cooling tower maintenance and cooling tower spare parts.

Related ICST service: Cooling towers in Malaysia. See all cooling tower projects.

PETRONAS RAPID: common questions

What did ICST do on the PETRONAS RAPID project?

28-Cell Low-Noise Counterflow Cooling Tower, Malaysia.

Who was the client?

PETRONAS RAPID Project.

When was the PETRONAS RAPID project?

2015.

Can ICST build a similar cooling tower?

Send the duty, site and tower type for a quote, or call our Bangkok team on +66 2 661 7723.

Discuss a similar cooling tower project

Tell us about your cooling tower project. Request a quote or call our Bangkok team on +66 2 661 7723.

Request a quote

ICST