Cooling tower projects
Past projects show what to expect before you ask for a quote.

Project directory
22 projects

Cawayan BacMan 3
2-Cell, Fiberglass FRP Splash Fill to Film Fill Conversion

Cooling Tower Disaster Recovery: EDC Philippines
Counter flow, Wood

Cooling Tower Replacement: Palinpinon Geothermal Plant (EDC)
Crossflow, FRP

EDC N2N Relocation Project
6-Cell, Counterflow

Keramasan Power Project
4-Cell, Concrete Counterflow

Lanxess
4-Cell, Counterflow, FRP

Mak Ban 6: Luzon, Philippines
6-Cell, Crossflow, Wood

Palinpinon 3
Crossflow FRP Cooling Tower

PTT Cracker Project
8-Cell, Concrete Counterflow

PTT GSP3 Fan Upgrade
Induced Draft ACHE

PTT LDPE II Project
8-Cell, Concrete Counterflow

Vinachem
4-Cell, Concrete

BacMan 1 & 2
6-Cell Counterflow Wood Cooling Tower

EDC Leyte: Air Cooled Heat Exchanger Soda Blast Cleaning
Air Cooled Heat Exchanger (ACHE)

Empire Farms Geothermal, Nevada, USA
3-Cell Counterflow FRP Cooling Tower

KBR: 6-Cell FRP Crossflow Tower, United States
6-Cell Crossflow FRP Cooling Tower

Palinpinon 2
Crossflow FRP Cooling Tower

Patuha Geothermal Power Plant, Indonesia
6-Cell Concrete Hybrid Counterflow Cooling Tower

PETRONAS RAPID
28-Cell Low-Noise Counterflow Cooling Tower

PTT Gas Separation Plant: 96-Bay ACHE Upgrade
96-Bay Air Cooled Heat Exchanger (ACHE)

PVC Plant Freeport, Texas
3-Cell Cooling Tower – Conversion from Wood Crossflow to FRP Counterflow System

Thailand Projects
Industrial Cooling Towers – Crossflow & Counterflow Systems
Project context and configurations
This page is for plant owners, engineers and engineering contractors who want to see how International Cooling Solutions (Thailand), known as ICST, has handled towers like theirs, by country, tower type and scope of work. The portfolio covers 22 cooling tower projects in 7 countries since 2008: new industrial cooling towers, replacements, conversions, relocations, repairs and air cooled heat exchanger (ACHE) work for power, geothermal, petrochemical and chemical plants.
Discuss your cooling tower project. Request a quote or call +66 2 661 7723.
Featured cooling tower project: PETRONAS RAPID
PETRONAS RAPID, Malaysia, 2015: a low-noise, 28-cell counterflow cooling tower package contracted for the PETRONAS RAPID ethane cracker, part of the RAPID Euro-Fuels development. View the PETRONAS RAPID project profile.
Cooling tower project directory
Filter the directory by country: all projects, Philippines, Thailand, Indonesia, United States, Malaysia, Singapore and Vietnam. Each profile lists the location, year, client and tower configuration.
Philippines (9 projects): Cawayan BacMan 3 (2011), Cooling Tower Disaster Recovery: EDC Philippines (2012), Cooling Tower Replacement: Palinpinon Geothermal Plant (EDC) (2012-2013), EDC N2N Relocation Project (2011), Mak Ban 6, Luzon (2008), Palinpinon 3 (2012-2013), BacMan 1 & 2 (2011), EDC Leyte air cooled heat exchanger soda blast cleaning (2018) and Palinpinon 2 (2012-2013).
Thailand (5 projects): PTT Cracker Project, Rayong; PTT GSP3 Fan Upgrade (2018); PTT LDPE II Project, Rayong (2011); PTT Gas Separation Plant 96-bay ACHE upgrade, Rayong (2018); and Thailand Projects (2012).
Indonesia (2 projects): Keramasan Power Project, Java (2012) and Patuha Geothermal Power Plant (2011).
United States (3 projects): Empire Farms Geothermal, Nevada (2011), KBR six-cell FRP crossflow tower (2015) and PVC Plant Freeport, Texas (2015).
Malaysia (1 project): PETRONAS RAPID (2015).
Singapore (1 project): Lanxess, Jurong Island (2011).
Vietnam (1 project): Vinachem, Tang Loong Industrial Zone, Lao Cai (2011).
Cooling tower projects by tower configuration
Counterflow cooling towers: PTT Cracker Project (8-cell, concrete), PTT LDPE II Project (8-cell, concrete), Keramasan Power Project (4-cell, concrete), Lanxess (4-cell, FRP), EDC N2N Relocation Project (6-cell), BacMan 1 & 2 (6-cell, wood), Empire Farms (3-cell, FRP), Patuha (6-cell, concrete hybrid) and PETRONAS RAPID (28-cell, low-noise).
Crossflow cooling towers: Palinpinon 2, Palinpinon 3 and the Palinpinon replacement (FRP), Mak Ban 6 (6-cell, wood) and the KBR tower (6-cell, FRP).
Conversions: Cawayan BacMan 3 (two-cell FRP tower, splash fill to film fill) and PVC Plant Freeport, Texas (three-cell wood crossflow tower converted to an FRP counterflow system).
Air cooled heat exchangers: PTT Gas Separation Plant (96 bays), PTT GSP3 fan upgrade (induced draft) and EDC Leyte (108 bays, soda blast cleaning).
Comprehensive cooling tower services behind every project
Each cooling tower project draws on the same service range from ICST: project engineering, cooling tower construction, maintenance services and after-sales service, with technical assistance throughout.
Project engineering: design, engineering and procurement for new industrial cooling towers, with durable materials suited to the site, such as FRP, concrete or wood structures.
Cooling tower construction: new towers, tower repair, reconstruction and replacement.
Performance testing: the system is checked against performance targets before handover.
Maintenance services: inspections, regular maintenance and a maintenance plan built around the tower.
Upgrades: thermal and structural upgrades that support energy efficiency and lower power consumption.
What our cooling tower projects cover
New cooling towers for petrochemical, chemical, thermal power and geothermal plants.
Replacement and upgrade: Palinpinon replacement with an FRP crossflow tower, and the FRP towers at Palinpinon 2 and 3.
Repair and disaster recovery: the EDC Philippines counterflow wood tower, returned to service through equipment replacement.
Relocation and rehabilitation: the EDC N2N relocation, where an idle tower was dismantled, moved and rebuilt, and the turnkey upgrade and rehabilitation at Mak Ban 6.
Long-term service: Lanxess in Singapore, awarded in 2011, where ICST has supported the owner since then to service, maintain and upgrade the cooling tower.
Air cooled heat exchanger work: a guaranteed minimum 15% airflow improvement across 96 bays at the PTT Gas Separation Plant, and soda blast cleaning of 108 bays at EDC Leyte.
Industrial applications and structures in the project portfolio
The projects serve geothermal power, power plants, petrochemical plants, chemical (butyl rubber, fertilizer production and PVC), gas separation and manufacturing customers. Towers are built in concrete, FRP and wood, in counterflow, crossflow and hybrid configurations, and the tower size ranges from three cells to 28 cells.
Cooling tower projects across Thailand
ICST projects across Thailand include the PTT Cracker and PTT LDPE II petrochemical towers in Rayong, the PTT Gas Separation Plant and PTT GSP3 air cooled heat exchanger upgrades, and wider Thailand work for oil and gas, petrochemical and thermal power customers. See cooling towers in Thailand.
Cooling tower projects: common questions
How many cooling tower projects has ICST completed?
The portfolio lists 22 projects in 7 countries since 2008, from new towers to repairs and air cooled heat exchanger upgrades.
Does ICST only build new cooling towers?
No. The projects include replacement, conversion, relocation, rehabilitation, disaster recovery, cleaning, fan upgrades and long-term service.
Which tower types has ICST worked on?
Counterflow, crossflow and hybrid towers in concrete, FRP and wood, plus air cooled heat exchangers.
Can I discuss a project like one of these?
Yes. Send the tower type, size, location and what you need, and our Bangkok team will respond.